In tunnels, both the lighting and the emergency control system must operate reliably. Plug-and-play concepts make installation and maintenance quick and easy.
Phoenix Contact delivers the power line and bus line pre-assembled to the construction site. Each cable in your tunnel project is cut to size in advance, fitted with the necessary connectors, and labeled.
The flexible and robust QPD installation system with proven QUICKON fast connection technology ensures rapid and error-free installation of the lighting. The three phases of the power connection are loaded equally, because the QPD system is equipped with phase rotation.
The option of pre-assembly in combination with auto-addressing the LED drivers significantly reduces installation time.